Call Us Now  602-292-2689

Certified Data Center Buildouts
Mission Critical IP Surveillance
Enterprise Network Cabling
Manufacture Trained Technicians
Cable Tray Design And Installation
Fiber Optic Termination And Installation
Copper Patching, Termination And Installation
Data Center Design
Overhead Cable Management
Chatsworth Network Cabinets
Vertically Exhausted Cabinets
Isolated Network Pods


Data Center Construction

Indecom is a Leviton Certified Contractor offering copper and fiber data solutions for Horizontal Cabling Applications as well as Design/Build Data Center Applications for our enterprise clients. Our design built Leviton/Berk-tek systems boast limited lifetime warranties. This is very advantageous to clients, as any failure or defect in the connectivity products and the cabling will be covered at no cost, including labor. All cabling is tested to standard specifications prior to being turned over to the client, documented results are also provided to the customer and the manufacturer as well as stored on Indecom’s private servers for future reference when needed.

Indecom offers Network Design Solutions and has Cisco and HP Certified Programmers and Sales Support on staff to help guide clients on network equipment purchases and selection during the design process. Indecom can also provide and design for networked power products such as network monitored UPSs and network monitored PDUs for maximum control and monitoring of your network’s vital power. With all of these advantages working for the mutual benefit of both parties, we insure that nothing gets missed and our clients receive a functional, turnkey facility, on time, every time.


Request A Quote




Data Center News/Articles


Apple Turning Closed Mesa Facility Into Data Center




437 S. 48th St. Suite #101 Tempe, AZ 85281  P • 602-292-2689  F • 602.903.7232
© Indecom, LLC